Utilities Technical Provisions & Standard Details

City of Cocoa Technical Provisions and Standard Details 2022

Construction of all potable water, reclaimed water, and sanitary sewer facilities shall conform to these Technical Provisions to be accepted for transfer of ownership and maintenance by the City of Cocoa Utilities Department.

Summary of Revisions

The table below serves to list the sections and details that were added or substantially revised in the City of Cocoa Technical Provisions and Standard Details issued in July of 2022 after being evaluated by the City of Cocoa Utilities Department.


Section / Detail
Added
Revised
2.2.1.1 Polyvinyl Chloride Pressure Pipe, 4” – 12” (Potable Water)

X
2.2.1.2 Fusible Polyvinyl Chloride Pipe, 4” – 12” (Potable Water)

X
2.5.14 Blowoffs

X
2.11.2 Configurations

X
2.14 Record Drawings
X
3.1.5.1 Water Based Acrylic

X
3.2.7.2 Manhole Channel

X
3.8.1 Precast Wet Wells

X
3.8.8 Control Panel
X
3.8.8.1 Pump Junction Box
X
3.8.8.2 Electrical Meter Enclosure
X
3.8.8.3 Disconnect Panel
X
3.8.8.4 SCADA
X
3.8.8.6 Emergency Generator
X
3.8.10 Conduit
X
3.8.11 Conduit Fittings
X
3.8.12 Grounding
X
3.9 Record Drawings
X
3 Wastewater - Approved Tapping and Line Stop Contractors

X
Appendix A. Approved Materials
X
Mater Meter Assembly Meter Station Detail

X
Master Meter Assembly Double Check Bypass

X
3-Inch and Larger Meter with Backflow Preventer Above Ground Installation
X
3-Inch and Larger Reuse Meter with Backflow Preventer Above Ground Installation
X
Canal or Drainage Ditch Crossing

X
Restrained Pipe Table Force Mains
X
Restrained Pipe Table Force Mains
X
Lift Station Specifications and Notes

X
Lift Station Electrical Panel Front Elevation

X
Lift Station Electrical Panel Rear Elevation
X
Lift Station Signage
X