The project will remove a significant hydraulic bottleneck within the raw water transmission system, and involves the construction of approximately 14,000 linear feet of large diameter (48") transmission piping from an area downstream of Well 13A (just west of the Little Econ River) eastward, then south along Dallas Road to the intersection with Wewahootee Road. The project will improve the efficiency of the transmission system, extend the useful life of the existing infrastructure, and remove portions of inferior pipe material.